Streamline your cyber security

With DirSys, you can work with cybersecurity in a structured and simple way. Identify risks, monitor compliance with legal requirements and measure against established standards — without getting bogged down in administration.

A selection of our clients
Kvinna i mörk kavaj lutar sig framåt och arbetar vid en laptop på ett kontor.

An overview of your cybersecurity

Many organizations lack an overall picture of what information they handle, how protected it is, and where the greatest risks are. At the same time, new regulations such as the Cybersecurity Act (NIS2) and new threats are increasing — often without resources.

The result is documentation fatigue, overloaded security features and increased risk.

With DirSys, you get a clear overview of risk, compliance, and priority security measures — without digging into Excel or hunting for information internally.

Skärmbild med vy över riskregister i DirSys plattform. Se hur ni ligger till mot exempelvis ISO/IEC 27002

Control over your cyber security

DirSys brings together risks, standards, action plans and follow-up in one place. You can see how you stand against, for example, ISO/IEC 27002 — and how rules and policies are complied with in practice.

Proactively work with risks and safety measures

Monitor risks and safety measures on an ongoing basis. With automation and clear control plans, you can work preventively — and at the same time save time.

Skärmbild av vy över riskhantering i DirSys plattform.
Skärmbild av kontrollplansvyn i DirSys plattform. Mät enkelt efterlevnad av lagkrav som NIS 2 och DORA.

Get control of standards and legal requirements

Identify the right security measures and comply with regulatory requirements such as NIS2 and DORA. With DirSys, you can easily measure your compliance against control plans and frameworks — without building your own solutions.DORA. Med DirSys mäter ni enkelt er efterlevnad mot kontrollplaner och ramverk – utan att bygga egna lösningar.

Simplify collaboration and build a safety culture

Cybersecurity is not just technology. The human factor is crucial. Spread the work internally with a common area where responsibility, follow-up and cooperation become clear. In addition, bring together GDPR and cybersecurity work for a more coherent way of working.

Skärmbild över information assets i DirSys plattform

A cohesive support for cybersecurity and regulatory compliance

Comply with legal requirements

Monitor compliance with NIS2, DORA and GDPR with GAP analyses and clear action proposals.

Work proactively with risks

Identify and prioritise risks using risk analyses and control plans.

Simple feed and help texts

Built to be easy to use — even for casual users.

Keep an eye on your security measures

See what should be done, who is in charge and when it should be ready.

Work with different types of information objects

Get an overview of your business through analysis of your organisation, process or system.

Template for documentation of information objects

Use the DirSys template for documentation of information objects — or easily customize it yourself according to your needs.

Follow best practices and comply with cybersecurity laws

Work with the frameworks and regulations you need — without drowning in tons of requirements. Use ready-made control plans or adapt to your business.

NIS2

GDPR

ISO/IEC 27002

CIS Controls v8

En kvinna med långt blont hår sitter vid ett skrivbord och tittar mot en öppen bärbar dator med en anteckningsbok framför sig.
Man with glasses and beige shirt listening to a person pointing while sitting at a table with a laptop.

Not yet another documentation system

Information and cybersecurity are often hard to document — and documents quickly become out of date. That's why DirSys works with verified cybersecurity.

Through integrations, we can control how security requirements are actually complied with in your IT environment. It reduces the risk of blind spots -- and turns cybersecurity into something more than a paper product.

Cybersecurity, IT Governance and GDPR — Collected

Gather your work in one place. Avoid duplicate documentation, see where the protection value is greatest, and comply with regulatory requirements more resource-smart through integrated solutions.

Man som sorterar och organiserar buntar med papper på ett bord i ett mörkt rum med ljus från sidan.

GDPR Compliance Tools

Compliant with GDPR in a simple and efficient way.

Kvinna i svart tröja läser dokument vid skrivbord med glasögon och rosa penna.

Framework and control plans

Work with safety requirements, without drowning in them.

Manage your information security in a solution built for it

Our cybersecurity solution is based on a role-based model that makes it possible to spread responsibility without compromising security. With 20 years of experience in the security industry, our solution is built for organizations with high demands on security.

Servers in Sweden

SSO & MFA

High traceability

Possibility of On-Prem

Händer som skriver på en bärbar dator på ett bord i ett mörkt rum.

Cybersecurity Solution FAQ

How does a cybersecurity solution help us?

You get a unified view, control over compliance and easier collaboration.

It helps you make more informed decisions, prioritize the right security measures and enhance your cybersecurity.

What is DirSys Security?

DirSys Security is our cybersecurity solution that helps organizations work in a structured way with their information security and cybersecurity. With support for risk analysis, action plans and automation, it gives you a clear and simple picture of how secure your organization is and how you comply with applicable legal requirements.

Who is DirSys cybersecurity solution for?

The solution is suitable for organizations that want to work proactively with cybersecurity and information security. It is used by the CISO to run the information security work, the IT manager who wants to raise the organization's cybersecurity, and legal professionals who want to check the organization's legal compliance.

Above all, it suits organizations that want to work simply and pragmatically and be able to control what it looks like for real — not just document it.

How is DirSys solution different from a GRC tool?

Many GRC tools are broad platforms that address everything from environment and sustainability to legal, risk and compliance. This often makes them heavy, complex and difficult to adapt to the rapid developments in cybersecurity and data protection.

Instead, DirSys is built with a full focus on cybersecurity, IT governance and data protection — areas where requirements are increasing most rapidly and where the consequences of deficiencies are greatest.

Unlike classic GRC tools, DirSys does not stop at documentation and self-assessment. Through integrations and automation, you can monitor how safety requirements are actually being complied with in practice, over time.

In a situation of new regulations, increased threats and limited resources, a focused and verifiable approach provides faster overview, less administration and better control than broad GRC solutions.

What will be the result of using DirSys solution?

The result is control over your information and cyber security - so you can rest assured that you are protected. Both from an organizational as well as a technical perspective. The solution helps you comply with applicable legal requirements and minimize security risks before they occur.

Can we run DIRSYS cybersecurity solution ON-PREM?

Yes. We offer both the solution as a cloud service with high security requirements, but we can also help you set it up as an On-Prem service.

Is it possible to coordinate data protection and information security work?

Yes, it goes along with our GDPR tool. This means that you do not need to document information carriers in several places and you can perform different types of risk analysis in the same interface. A common thread between data protection and cybersecurity!

How do we get started?

Start by book a demo with us. Then we will review how you work today and what you want to improve.

At a first demo, we will look at your existing working methods and needs to see if we can help you move forward. Once you have decided to get started, the implementation takes place smoothly with support from us.

Get started with DirSys cyber security solution

Curious about how to get started with DirSys cybersecurity solution? Book a demo here.